  • Talimarjan 2 CCPP

    “EXPANSION OF THE TALIMARJAN THERMAL POWER PLANT WITH THE CONSTRUCTION OF TWO MORE COMBINED CYCLE GAS TURBINES WITH A TOTAL CAPACITY OF AT LEAST 900 MW”

    1. Project Owner : UZBEKENERGO
    2. Contractor : Hyundai Engineering & Construction
    3. Soil Investigation & Index design
  • SGCC
  • SGCC

    “Expansion of production capacity of Shurtan Gas Chemical Complex Project”

    1. Project Owner : UZBEKNEFTEGAZ
    2. Contractor : Enter Engineering
    3. Site Preparation QA/QC
  • WWTP
  • WWTP

    “Tashkent Water Waste treatment Plant Modernization Project”

    1. Project Owner : UZSUVTAMINOT
    2. Contractor : Saman Eng.
    3. Topo survey & Soil Investigation for FS
  • Air Product Yangiyer Fetilizer PROJECT
  • Air Product Yangiyer Fetilizer PROJECT

    “A $600 million fertilizer plant. It produces 780,500 tons of mineral fertilizers, including 567,800 tons of nitrogen, 92,000 tons of phosphate and 120,800 tons of potassium fertilizer.”

    1. Project Owner : UZKIMYOSANOAT
    2. Contractor : Wison
    3. Soil Investigation & Index design
  • NAVOI 3
  • NAVOI 3

    “Navoi Thermal Power Station Modernization Project (Phase 3)”

    1. Project Owner : UZBEKENERGO
    2. Contractor : Hyundai Engineering & Construction
    3. Soil Investigation for bidding price with HEC
  • ДЖИЗАК АЭС
  • ДЖИЗАК АЭС

    “Атомная электростанция, Джизак”

    1. Project Owner : UZATOM
    2. Contractor : O’zgashikliti
    3. Soil Investigation for FS with O’zgashikliti
  • UTCC
  • UTCC

    “Takhiatash Power Plant Efficiency Improvement Project”

    1. Project Owner : UZBEKENERGO
    2. Contractor : Hyundai Engineering CO., LTD.
    3. Soil Investigation & Index design
  • airport
  • Soil investigation, Project for validity research international airport new passenger terminal Tashkent, Uzbekistan

    1. Project Owner : UZBEKISTAN HAVO YO'LLARI
    2. Contractor : Incheon Airport
    3. Topo survey & Soil Investigation for FS
  • UZGTL
  • UZGTL

    “Uzbekistan Gas To Liquid palnt”

    1. Project Owner : UZBEKNEFTEGAZ
    2. Contractor : Hyundai Engineering & Construction
    3. Site Preparation QA/QC